Load Case Name
Assign the load case name. Click to the right to enter, additional load cases and modify or delete existing load cases.
Load Group Name
Select the desire Load Group that will include the entered Pretension Loads data. Select "Default", if a Group assignment is unnecessary. Click to the right to add, modify or delete Load Groups.
|
Options
Add: To enter new or additional pretension loads
Replace: To replace previously entered pretension loads
Delete: To delete previously entered pretension loads
Pretension Load
Enter positive (tension) or negative (compression) pretension load.
Note
If Pretension Loads are unspecified in Cable Elements, midas Civil calculates the initial stresses using the weight density and the cable geometry.
|