Change Load Group

 

 

 

Loadings of a predefined Load Group are copied or moved to another Load Group or deleted. When loadings for each construction stage are created for a construction stage analysis, copying or modifying the previously defined load groups may prove to be more convenient.

 

 

 

From the Main Menu select Structure > Group > Change > Change Load Group

 

 

to the right of Change Load Group: review Load Group Table

 

Options

Copy: copy the load data included in Source Group to Target Group

Move: move the load data included in Source Group to Target Group

Delete: delete the load data included in Source Group

 

Boundary Group

Source: original group

Target: destination group (inactivated when Delete is selected)

: click to prompt the Define Load Group dialog box to add or modify groups.

Item: select the types of loadings to be copied, moved or deleted.