Set-Back Loads for Nonlinear Construction Stage |
|
|
|
|
|
In a multi-span suspension bridge, top tower saddle can be shifted relative to the tower before starting the cable erection. Saddle can be simulated using Elastic Link (Saddle type). Impose set-back loads for nonlinear construction stage to specific elastic links whose type is Saddle to reflect the set-back displacement of the tower saddle of the suspension bridge. |
|
|
|
|
|
|
|
From the Main Menu select Load > Construction Stage> Construction Stage Loads > Set-Back Loads for Nonlinear Construction Stage. |
|
|
|
|
|
Specify displacement by direction of the elastic link which corresponds to the saddle of the suspension bridge. Dx / Dy / Dz
Only saddle type elastic links will be shown in the window. Select an elastic link and click the Apply button. |
|
|