General Camber Table

 

 

Camber table is produced for the Structure Groups designated in General Camber Control.

 

 

 

From the Main Menu select Results > Bridge > Camber/Reaction > General Camber > General Camber Table.

 

 

Stage: Construction stage

Node: Node number

Note
When the mouse is right-clicked, the "Style Dialog" Context Menu prompts.

 

Revision of Civil 2015 (v1.1)

Q1. I got the camber using General Camber. Suppose measured camber during actual construction is different from the predicted camber by software. How can I adjust the error?