Change Load Group
|
|
|
|
|
|
Loadings of a predefined Load Group are copied or moved to another Load Group or deleted. When loadings for each construction stage are created for a construction stage analysis, copying or modifying the previously defined load groups may prove to be more convenient. |
|
|
|
|
|
|
|
From the Main Menu select Structure > Group > Change > Change Load Group
|
|
|
|
|
|
|
|
|